Orcle Project Life Cycle: Using AIM (Application Implementation Methodology)

Project Life Cycle Stages in an Oracle Application Implementation Project using AIM
A Project is not a short term activity to be completed in matter of days, it requires intensive analysis, thoughtful thinking and serious decision making in core and critical business activities. There decisions taken at every stage is critical and irreversible, there is no going back after
performing final step. We have to understand how a long term project is broken up into phases and completed smoothly.

Stages of Oracle Application Implementation Project (AIM)
Definition
Operation Analysis
Solution Design
Build
Transition
Production

Stage 1 - Definition of Project Management

Project Level activities:
  • Project Planning: The whole project is broken in to different phases and for each phase a detailed plan is laid out which in turns account for the overall project plan. Project Plan must be revised whenever there is a Change in the contract or requirement of the client
  • Build required Assets: Consider the requirements and available resources
  • Prepare & Conduct CRP1 workshops
  • Conduct Phase end review

Documentation to be Prepared:
Project Plan (Finalized or Draft) & Write up about the Client and the Consultant.

Stage 2 - Operational Analysis

A Critical stage of the Project. One must devote the maximum possible time to this stage. In this stage a Consultant, who is a total stranger to the client so far is going to make an effort to become an expert in understanding the client business every inch. Only when he masters the
clients business, he will be in a position to think beyond it and provide solutions considering the impact it can have on overall business.

Project Level activities:
  • Clearly understand the contractual obligations made between the client and the consultant with respect to the work to be performed
  • Detailed study on the Client business and Organization Structure 
  • Capture the current business process as they are following ( Also known as AS IS documentation) 
  • Collect the requirements from the client, managers, end users as to what they expect from the Oracle Product 
  • Requirements with respect to Functional Side as well as Technical Side is collected 
  • Document the bottlenecks faced with the existing system in place 
  •  Most important point is that get the document signed from the client 
  • If required prepare CRP2 environment & conduct workshops

(Note: Normally speaking once a requirement is expressed at this stage, it will be taken care by the consultant, however in real time, and requirement gathering becomes a day to day activity in many clients place, which is highly unprofessional way of working)

Documentation to be Prepared:
RD 10 --> Current Financial and Operating    Structure
RD 20 --> Conduct Current Business Baseline
RD 50 --> Gather Business Requirements

Stage 3 - Solution Design

Based on client’s current business practices and future requirements, consultant must begin the process of providing solutions to each and every aspect. Enough analysis has to be done in drafting the new business process of the client which is going to be followed here after, it is also known as To Be Process

Project Level activities:
  • If possible provide outbox solution
  • If not, think about the possibility of workaround / Customizations 
  •  Client Acceptance: Once the solution is decided on, the same must be communicated to the client seeking acceptance. When the client is satisfied with the solution, consultant can put an end to his research work on providing alternate solutions.

Documentation to be Prepared:
BP 80 --> Develop Future Process Model ( To be process )
BR 10 --> High Level Gap Analysis
BR 30 --> Business Requirements Mapping
MD 50 --> Application Extension Functional Design
MD 70 --> Application Extension Technical Design

Stage 4 - Building Stage
Performing setups and access to the instance begins here

Project Level activities:
  • Based on the Solution design and new business process (To Be) designed at the previous stage, the consultant starts performing setting up of the Application 
  • In case of a functional requirement, it will be setups from the front end 
  • In case of technical requirements, sql scripts, and customizations will be performed 
  • Document all the setups that have been carried out at this stage, since it will be useful when the production Instance is configured or when there is a system crash or corruption of data or any hardware failure. After performing all required setups, the system has to be tested for its readiness to carry out operations

Documentation to be Prepared:
BR 100 --> Application Setup
TE 20 /30 --> Unit/link Test Script
TE 40 --> System Test Script
TE 50 --> System Integration Test Script
TE 120 --> System Integration Test Plan

Stage 5 - Transition Stage

In this stage, client is exposed to the Applications for the first time to get the comfort level. In order to make the client to get a feel of the system, user guides, training manuals and training may be given in understanding how their business is completely taken care by the product. Once the client is exposed to the Applications, they normally tend to show some interest in learning new things, which can be used for testing the system. Once the client is satisfied with the Solutions and the way in which the system performs, he expresses his willingness to accept the system.

Project Level activities: (In real time, acceptance will be taken up at two levels)
  • First Level – CRP3 - Conference Room Piloting : Where the consultant gives a preview of the new system to the selected members of the client and gets their feedback 
  •  Second Level - UAT User Acceptance Testing:Here the consultant gives detailed demonstration on the new system to the users (Super and End), and get the acceptance from the users that the new system meets their expectations 
  •  Prepare production environment 
  •  Convert & Verify Data 
  •  Verify production readiness 
  • Begin production
Documentation to be Prepared:
TE 130 - User Acceptance Test Report

Stage 6 - Production Stage

Once CRP and UAT is approved, it is the duty of the consultant to replicate the same in a new environment which will be used solely and exclusively for the Production purposes only. After making the production server ready with all setups, it is advised to clone the production server to a development or test server, so that any value addition or future testing can be carried out
separately in future. Once the production server is ready, it is given to the client to begin their operations, which is termed as GO LIVE. In order to assist the client in adapting to the new system, consultant will provide them with User Manuals and also a support consultant for a short period of time if needed.
Once the production server is ready and used, the implementation gets over, and the client should give it in writing that he is satisfied with the implementation taken place, which is termed as sign off (A Big Good Bye)!
Project Level activities:
  • Maintain System
  • Propose Future Direction
Documentation to be Prepared:
User Manuals
Client's sign off on the Acceptance Certificate

(Note: Documentations suggested in this post is recommended when AIM is adopted. Nothing is mandatory in implementing a project; users can have their own methodology)